T: 1700-81-9753 info@ajtgeo.com
AJT GeosyntheticsGround Engineering · Since 1994

Ground improvement contractor in Malaysia

Soft ground, made solid.

Since 1994, our group has prepared the ground beneath Malaysia's expressways, airports, railways and reclaimed coastline. We supply the geosynthetics and install them ourselves, with our own rigs and crews.

1994Breaking ground since
500+Project sites across Malaysia & abroad
38Installation rigs in our own fleet
38 mMaximum PVD installation depth
Gateway Structure Sdn. Bhd.CIDB Grade G7ISO 9001 QualityISO 45001 SafetyISO 37001 Anti-Bribery
Who we are

Material, machines and people under one contract

Ground-improvement work usually involves a material supplier, a plant owner and an installer. AJT Geosynthetics brings all three together in one Malaysian group.

We supply the drains and fabrics, mobilise our own rigs and put our own trained crews on site. You get one programme, one point of contact and one team that answers for the result.

  • Our own fleet of 38 rigs, installing PVDs up to 38 m deep
  • Gateway Structure Sdn. Bhd.: CIDB Grade G7, ISO 9001, ISO 45001 and ISO 37001
  • Trusted on KLIA2, ECRL, the West Coast Expressway, MRT and Westports
Meet the Group
Aerial view of three AJT PVD rigs installing vertical drains on a cleared site
30+years on site
38 rigs. 500+ project sites. One accountable group.Ground improvement since 1994
How we work

From tender to handover

The same team carries your project through every stage.

Assess

We study the soil investigation, design and programme alongside your engineers.

Plan

Method statement, shop drawings, material submittals and a rig deployment plan, ready for approval.

Install

Our rigs and crews mobilise to site, and every drain, roll and tube is recorded as it goes in.

Verify

Penetration records, QA/QC checks and as-built documentation at handover.

Track record

Recent & landmark projects

View all projects
AviationOngoing

Limbang Airport Runway Extension

Limbang, Sarawak

Vertical drains to consolidate soft ground ahead of a longer runway in northern Sarawak.

Kemena Holding2025–2026
Port

Westports CT10–CT13 Reclamation

Port Klang, Selangor

PVD installation for the dredging and land reclamation works of new container terminals CT10 to CT13.

China Communications Construction2025–2026
Highway

West Coast Expressway

Perak / Selangor

PVD and geotextile works on multiple sections of the Banting–Taiping expressway.

WCT · Gabungan Cekapbina · IJM2015–2025

Delivering for Malaysia's leading contractors

IJMWCT ConstructionTaiseiMRCBPenta-OceanHyundai E&CSunway ConstructionSinohydroKellerGadangTSR BinaJBB BuildersKemena

Building on soft ground?

Send us your drawings or site details. We'll come back with a method, a programme and a price for supply and installation.

Talk to Our Team